Step 6 Repairs (Through Mar 25, Saturday Evening)

We mostly put in a few more doors and wallboard in the Master Bedroom.

For the non-visual items, we fixed a problem with the water line from the pump to the house.
The water stopped working (well powered, but no water pressure) and we had the well guy out to investigate. He determined that the pump was pumping and pumped water all over the ground to prove it!
We dug up the ground to find the problem with it and to find the binding of the garage wiring at the same time, but found no problem with the water lines.
We disconnected it at the pump and pulled it into the house and learned it was full of ice. We then thawed it out and I attached a heating line to the pipe and wrapped it with foam before putting it back in the 4 inch PVC that it was in.
Now we have water and a workaround (the heat tape) if it ever freezes again. We put (2-4 layers of) pink foam board over the pipe we had dug up before replacing the dirt.

IMG_6982.JPG 3 Steps for the Master Bedroom Closet
<== 1. No Closet (back pre-Step 5)
==> 2. Unfinished Front on Closet with plugs (Step 5)
==> 3. Closet with all but doors (with light)
Master Bed Room New Closet 100_1898.JPG
100_1901.JPG <== Master Bedroom Closet Before Front Wallboard
Master Bedroom Closet Front Wallboard In ==>
Master Bed Room New Closet
100_1854.JPG <== Master Bedroom/Bath Door Out
Master Bedroom/Bath Door In ==>
100_1900.JPG
100_1859.JPG <== Master Bedroom Hall and Bath Doors Out
Master Bedroom Hall and Bath Doors In ==>
100_1902.JPG
IMG_6992.JPG <== Master Bath Bedroom Door Out
Master Bath Bedroom Door In ==>
100_1906.JPG
IMG_6998.JPG <== Master Bath Hall Door Out (From Outside)
Master Bath Hall Door In ==>
100_1905.JPG
DSCF5245.JPG <== Master Bath Hall Door Out (From Inside)
Master Bath Hall Door In ==>
100_1904.JPG
Master Bed Room New Closet Ceiling <== Master Bedroom Closet Light Out
Master Bedroom Closet Light In ==>
100_1897.JPG

Home Pic | Home Pic
<==Go Back to Step 5 | ==>Go to Step 7 | Return to Hunley Home Page