Step 3 Repairs (Mar 04, Saturday Evening)

In addition to the work shown below, the Engineer came out and got all of the pictures and measurements he needed to do his structural analysis and recommendations.
Dan and I also fixed the plumbing since it had some burst pipes and leaky joints. All is well now with the plumbing!
I added a few more electrical covers on some junction boxes as well.
For picture worthy work, first I fixed the missing Handrail by putting a board over the hole to protect the kids, then I added the top rail cut from the old upright.
100_1750.JPG 100_1769.JPG 100_1771.JPG
Next, Dan and I fixed the 2nd floor bath floor by removing the mixture of planks, plywood, and cement board and replaced it with 3/4" Tongue and Groove OSB.
This set of pictures is the start to finish from the hall view.
IMG_6998.JPG 100_1727.JPG 100_1781.JPG
100_1786.JPG 100_1788.JPG 100_1789.JPG
This set of pictures is the start to finish from the Master Bedroom view.
IMG_6989.JPG 100_1782.JPG 100_1791.JPG
Now a picture from the window looking back.
100_1790.JPG
Finally a set from the bathroom below.
100_1783.JPG 100_1784.JPG 100_1785.JPG