Step 1 Repairs (Feb 18, Saturday)

IMG_7158.JPG <== Boards laid on floor joists (log beams)......
New 3/4" Tongue and Groove Staggered Flooring installed ==>
100_1722.JPG
IMG_7149.JPG <== Big Jacuzzi Tub in (too close to Window)......
Bare Floor (Tub and drain removed) ==>
100_1729.JPG
1 Bath Tub In <== 1st Floor Bath Tub in......
Bare Floor (Tub removed) ==>
1 Bath Tub Out
IMG_7025.JPG <== Missing wallboard at bottoms of existing board......
Wallboard installed ==>
100_1733.JPG 100_1731.JPG